Find Auto Injection Mould, Metal Pressing Die, Washer Stamping Metal Die on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Home > Products > Others Dies > Injection Mould/Washing Machine Plastic Mould/Molding/Appliaces Mould

Injection Mould/Washing Machine Plastic Mould/Molding/Appliaces Mould

Productivity: 
8000
Place of Origin: 
Qingdao China
Supply Ability: 
8000
Certificate: 
ISO

Basic Info

Model No.:  HRD-Z134

Product Description

Model NO.: HRD-Z134 Surface Finish Process: Polishing Plastic Material: PP Application: Household Appliances Design Software: UG Certification: ISO Customized: Customized Mould Life: 50~100 Shots Cavity: 1*1 Trademark: Higrade/injection mould Origin: Qingdao China Shaping Mode: Injection Mould Mould Cavity: Single Cavity Process Combination Type: Single-Process Mode Runner: Hot Runner Installation: Fixed Standard: HASCO Qingdao China: 2738hh,Nak80,738,2344,S136,Sdk61,P20,Px5 Material: PP Applicable Range: Appliance Mould Specification: ISO9001: 2008 HS Code: 8480710090 Mould Steel:2738HH,NAK80,738,2344,S136,SDK61,P20,PX5 etc.
Mould Life:50~100 shots
Material: PP
Cavity: 1*1
Applicable range: Automotive  
Lead Time: 35-45 days
Hot runner:Yes (according to the customer's request and product style)
Standard part: PUNCH, MISUMI
First trial equipment: 380T Injection Machine( moreover we also have 90-700T,750-1300T Injection Machine. There are robots for each 90-380T Injection Machine to meet the customer's bulk production requirement.
Our service: product and mould design, Injection mould and parts machining.
Our main customer: Haier, Hisense, Midea, Siemens, SANYO, ELX, Toyota, Kia, Foton, GM Wuling, Great wall, Hyundai, Skyworth.
 Overseas market: Japan, Korea, Thailand, Russia, Germany, England, Norway, Italy, USA, Spain, Turkey, Denmark, Brazil, Argentina, Egypt, South Africa, Iran,Pakistan,India.
Mould painting: according to Customer's request
Packing: Wooden Case
The first trial success rate is above 95%
Quotation : provide quotation in 24hours after received the customer's drawing .
Design software: 2D/3D drawing or samples
Manager: Concentrate on project tracking and after service
Engineer: 30-50 excellent engineers, have many years experience and English communicating well.
The purchase department use EPR system to make sure buying materials in time.
70-130 experienced workers can meet the customer request of batch production.
Quality department:15 members quality control workers, testing the mould and parts by CMM and projector.
Domestic delivery: logistics transportation
Delivery to overseas: FOB/CIF/DDU by sea shipping or air shipping
We obtain the ISO9001:2008 quality system certificate by SGS from 2007. We build complete organization including top management, marking department, project management, purchase department, engineer department, production department, and logistic department.
  
 
Fitter Quality testing
First die by the fitter for a thorough inspection of the mold as follows: Die ring balance? Tap hole and the nozzle threaded holeare concentric rings, and there is no interference?
 Core spray anti rust agent, thimble ejection is smooth, mould parts are complete, the slider is smooth, faucet installation        The slider, the top block, fixed, dynamic model is Water Leakage? (0.5-1.5Mpa*5 minutes to keep)
According to the customer request is equipped with the factory. Water, oil flow, no residual iron, remains in the mold cooling water, gas removal
 Ensure the mold factory 100% acceptance (including:assembly, test mode etc.) Travel or stop switch is installed? Mold plate is installed?
Die appearance: water mark, mark, mark rings hole templateare complete; the surface rust are clean, then coated withanti rust oil, wooden packing. Mandril reset is smooth, set out is smooth, no blocking, no abnormal sound; slide block moves smoothly?
With mold factory data and CD etc. Oil cylinder action normal? Template, reference angle,water, oil, gas path identification and numbering, ejecting hole is in accordance with the requirements of injection molding machine?
  The positioning ring compliance requirements? Rubbersleeve ball R is consistent with the Injection Molding Machine?
  The support legs refuse nail is installed, and highlyconsistent? Support column is higher than the mold foot?Locking device is installed?
  If the exhaust slot? Hot runner wiring shall be binding, with plate cover, to prevent the assembly pressure off the wire,hot runner heating wiring is correct, reliable and so

Contact us if you need more details on Injection Mould. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Washing Machine Plastic Mould、Appliance Mould. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Others Dies

Email to this supplier
  • *Subject:
  • To:

  • *Messages:
    Your message must be between 20-8000 characters