Find Auto Injection Mould, Metal Pressing Die, Washer Stamping Metal Die on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Home > Products > Others Dies > Stage Die for Toyota Seat Backs

Stage Die for Toyota Seat Backs

Productivity: 
2000PCS/Week
Place of Origin: 
Qingdao, Shandng Province
Supply Ability: 
2000PCS/Week
Certificate: 
ISO 9001

Basic Info

Model No.:  HRD-Z125

Product Description

Model NO.: HRD-Z125 Kaller: Gas Spring System Certificate: ISO9001:2008 Trademark: Higrade Origin: Qingdao, Shandng Province Certification: ISO 9001:2008 Place of Origin: Qingdao, China Manufacture Expe: More Than 11 Years Specification: SGS HS Code: 8207300090 {Steel material}Cr12MOU,SKD11,SKH-9,DC53
{Product material}:SUS304,SPCC and so on
{Scope of application}:Automotive
{Die types}:Single process
{Mould Life}:50~100 shots
{Tolerances}:0.02mm
{Processing Date}:35~45 days
{Spare parts}:PUNCH ,MISUMI and so on
{Equipment}:400T Punch
{Produce equipment}:315T Hydraulic machine/press,400T\200T\160T Punch (With the belt feeding machine),110T,80T,40T Punch equipment ,Can meet the need of mass production and testing.
{Service content}:Designing and manufacturing for metal mould and products.
{Main customers}:Haier, Hisense, Midea, Siemens, Sanyo, Electrolux, Toyota, KIA, Foton, SGMW, SKYWORTH etc.
{Main export markets}:Japan, Korea, Thailand, Russia, Germany, Britain, Norway, Italy, Spain, Turkey; America, Brazil, Argentina;South Africa Egypt; Iran, Pakistan, India etc..
{Mold paint}: Painting color depends on customer requirements
(Packaging: wooden case)
The first trial success rate is above 95%
{Quotation time}:we will quote in 24 hours after receiving the customer's drawings.        
{Data needed to offer}: 2D/ 3D drawing or samples
{Quotation}:Including the accurate price/stage/life and process time.
{The profile}:2D/3D drawing or samples
{Project Manager}:Concentrate on project tracking and after service
{Engineer}:30-50 excellent engineers, have many years experience and English communicate well.
{Warehousing and logistics}:The purchase department use EPR system to make sure buying materials in time.
{Fitter technician}:100-130 experienced workers can meet the customer request of batch production.
{Quality department}:15 members quality control workers, measuring the mould and parts by CMM and projector.
{Domestic delivery}:logistics transportation
{Delivery to overseas}:FOB/CIF/DDU by sea shipping or air shipping
 
Mold factory, fitter & quality inspection work to be done:
Fitter Quality testing
First die by the fitter for a thorough inspection of the mold as follows: Die size (I* W * H)
Die accessories are complete If the mold specification matching and customer equipment(height, the size of a mould, mould position)
Ensure the mold factory 100% acceptance (including:assembly, test mode etc.) There is no die shank (reasonable)
According to the customer request is equipped with the factory. Die code is complete (item, process name)
Die appearance: template logo are complete; the surfacerust are clean, then coated with anti rust oil, wooden packing. Whether to need to mold brand
With mold factory data On the,In the lower limit of a column is complete, paint color and reasonable
  Mold inserts, punch is complete
  Screw dismounting have wear / screw holes are offset
  The die structure is reasonable / mould factory data is complete
 
 

Contact us if you need more details on Stage Dies. We are ready to answer your questions on packaging, logistics, certification or any other aspects about Stage Moulds、Auto Press Tool. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Others Dies

Email to this supplier
  • *Subject:
  • To:

  • *Messages:
    Your message must be between 20-8000 characters